• DNC Standard cylinder Series
    中国
    DNC系列

    DNC Series ISO15552 and VDMA24562

    Standard cylinder

    ※Installation and application

    1. When the load has change during work, it is necessary to select the cylinder with sufficient output force;

    2. At high temperatures or corrosive conditions, it is necessary to select the corresponding high-temperature resistance and corrosion resistance cylinder;

    3. In the cases of high humidity, excessive dust, or water drop, oil dust, and welding slag, necessary protective measures shall be taken for the cylinder;

    4. Before connecting the cylinder to the pipeline, it is necessary to remove dirt in the pipeline to avoid impurity entry into the cylinder;

    5. Medium for the cylinder can be used after being filtered by the filter element above 40 um.

    6. In low temperature environment, it is necessary to take antifreezing measures to prevent water freezing in the system.

    7. Before use, the cylinder shall undergo no-load test run; before running, it is necessary to adjust buffer to a minimum and then gradually loosen it to avoid cylinder damage due to too large impact;

    8. The cylinder shall be avoided from lateral load during work to maintain normal work of the cylinder and extend its service lifte;

    DNC系列 DNC Series ISO15552 and VDMA24562 Standard cylinder ※Installation and application 1. When the load has change during work, it is necessary to select the cylinder with sufficient output force; 2. At high temperatures or corrosive conditions, it is necessary to select the corresponding high-temperature resistance and corrosion resistance cylinder; 3. In the cases of high humidity, excessive dust, or water drop, oil dust, and welding slag, necessary protective measures shall be taken for the cylinder; 4. Before connecting the cylinder to the pipeline, it is necessary to remove dirt in the pipeline to avoid impurity entry into the cylinder; 5. Medium for the cylinder can be used after being filtered by the filter element above 40 um. 6. In low temperature environment, it is necessary to take antifreezing measures to prevent water freezing in the system. 7. Before use, the cylinder shall undergo no-load test run; before running, it is necessary to adjust buffer to a minimum and then gradually loosen it to avoid cylinder damage due to too large impact; 8. The cylinder shall be avoided from lateral load during work to maintain normal work of the cylinder and extend its service lifte;
    Type
    New
    Price
    $1 (USD)
    Status
    In stock
    0 Comments 0 Shares
  • QCKA50*100-Y Rotary clamp cylinder
    中国
    QCKA50*100-Y

    QCK Series

    Rotary clamp cylinder

    ※Installation and application

    1. In the common cases such as: edge covering, assembling, and fixture test, it is necessary to select the standard welding and clamping cylinder;

    2. In the surrounding high magnetic field produced by the welder, it is necessary to select the strong magnetic resistance welding and clamping cylinder and the corresponding strong magnetic resistance switch;

    3. Before the cylinder piping, it is necessary to remove dirt in the pipeline to avoid impurity entry into the cylinder;

    4. Medium for the cylinder can be used after being filtered by the filter element above 40 um;

    5. In high temperature environment, it is necessary to take the corresponding high temperature resistance cylinder. In low temperature environment, it is necessary to take antifreezing measures to prevent water freezing in the system;

    6. When the cylinder is removed and not used for a long time, it is necessary to pay attention to the surface rust; in addition,air inlet and exhaust port shall be applied with dustproof plug cap additionally and piston rod end shall be coated with anti-rust oil.
    QCKA50*100-Y QCK Series Rotary clamp cylinder ※Installation and application 1. In the common cases such as: edge covering, assembling, and fixture test, it is necessary to select the standard welding and clamping cylinder; 2. In the surrounding high magnetic field produced by the welder, it is necessary to select the strong magnetic resistance welding and clamping cylinder and the corresponding strong magnetic resistance switch; 3. Before the cylinder piping, it is necessary to remove dirt in the pipeline to avoid impurity entry into the cylinder; 4. Medium for the cylinder can be used after being filtered by the filter element above 40 um; 5. In high temperature environment, it is necessary to take the corresponding high temperature resistance cylinder. In low temperature environment, it is necessary to take antifreezing measures to prevent water freezing in the system; 6. When the cylinder is removed and not used for a long time, it is necessary to pay attention to the surface rust; in addition,air inlet and exhaust port shall be applied with dustproof plug cap additionally and piston rod end shall be coated with anti-rust oil.
    Type
    New
    Price
    $1 (USD)
    Status
    In stock
    0 Comments 0 Shares

No results to show

No results to show

No results to show

No results to show

Sponsored